LOCATION: Bremerton, WA TYPE OF CONSTRUCTION: Project Management The existing Bremerton Substation is an energized substation, which is critical to PSE’s system, and remained energized through the majority of the project. Scope of work consisted of the construction of drainage improvements, augered concrete foundations, final surfacing, installation of a concrete walls, fencing, and landscaping. In addition, improvements were made to the existing control house in the form of sandblasting, weatherizing, and painting.
|