Cheney Stadium - Tacoma, Washington

COMPLETED PROJECTS

Athletic Facilities

Cheney Stadium Remodel
Tacoma, Washington

This scope of this $1.6M remodel project included creating a new dramatic entry feature, an architectural fence enhanced by 16 graphics panels. In addition, new ADA seating platforms were installed in the Stadium bowl, and the North Dining Area along the 3rd baseline outfield was transformed into a "group friendly" hosting area.

Aquatic Combat Training Facility, NS Everett
Everett, Washington

This design/build project consisted of a New Aquatic Combat Training Facility and Weight Room Addition at the Naval Station in Everett. The facility includes a natatorium with an 8-lane competition pool and a 13-foot dive tank with a fixed platform. The facility's main functions include survival training, rescue swimmer training, SCUBA instruction, and recreational swimming for the base.

Fort Knox Sports Complex
Fort Knox, Kentucky

This design/build project includes six softball fields, two soccer/football fields, and two concession/scorekeeper buildings. The infield areas are topped with a blended material and the remaining fields are turf. The softball fields are designed to meet the ASA guidelines. All fields have lighting for safe nighttime play.

More Completed Projects:

P.O. Box 1728
Gig Harbor, WA 98335
Phone: (253) 851-9309
Fax: (253) 851-6475

© 2007 - All Rights Reserved
Wade Perrow Construction LLC

Website Design By:
Wilford Design
Gig Harbor - Tacoma
Web Design